Job offerings at Blue Water Systems
Date:  
Oct.19.2017
 
Read more...

Blue Water Systems has an opening for an experienced 60 ton Tow Boat Skipper. Compensation based on experience. If you are interested in full time employment with benefits please contact us at info@bluewatersystems.ca.

 
Pictures of Construction for Victoria Marina
Date:  
Jun.01.2017
 
Read more...

The Victoria International Marina is scheduled to open in a few months. Below are a few pictures of construction to-date.

 
Marina Taking Shape in Victoria
Date:  
Apr.12.2017
 
Read more...

Blue Water System Floats Victoria International Marina

Image:

 
Global News Video - New Victoria Marina
Date:  
Oct.17.2016
 
Read more...

Global News interviewed stakeholders and local residences on the development of the new Victoria International Marina.  Victoria's current available moorage doesn't include many berths for larger yachts.

 
Victoria International Marina Progress
Date:  
Sep.14.2016
 
Read more...

Construction is Well Underway of New Marina Project

The first piles for the new Victoria International Marina have been driven into the bedrock. We are in full swing as construction ramps up.

 
Floats Arriving for Victoria International Marina
Date:  
Jul.12.2016
 
Read more...

Almost 8 years after it was originally announced the Victoria International Marina construction project is finally underway. This is one of our biggest projects to date at $24 million. We are very excited to get construction underway.

 
2014 Global Petroleum Show in Calgary, Alberta
Date:  
Jun.10.2014
 
Read more...
This trade show hosts an extensive showcase of technology driving the petroleum industry. It features rigs, drives, casings, muds, fracturing and perforating, downhole, measurements and more.
 
Wild Rose Marina
Date:  
Jun.04.2014
 
Read more...

For the better part of 6 months (deepest winter aside) Blue Water Systems has been working at Shushwap Lake installing a marina of sizable proportions.

 
Sea Plane Terminal Coal Harbour
Date:  
Feb.14.2013
 
Read more...

Blue Water Systems has now completed a new terminal on the water for Harbour Air in front of the new Convention Centre in Coal Harbour.

 
Wheelchair Accessible Docks
Date:  
Nov.30.-0001
 
Read more...

Wheelchair Accessible Docks

Our custom built docks and ramps are built to accomodate any differently abled people that may be required to use the structure.

 
 
Blue Water Systems © 2017. All Rights Reserved. Web design and hosting by NetClimber